Construction took place between 2010 and 2015. Nelson and Castlegar Ready Mix are proud to be supplying ready mix concrete for the construction of the new powerhouse from our portable concrete batch plant located a few kilometres from the job site. This project, Waneta Expansion, is a partnership, with Fortis Inc. holding a 51% share in the project and the two Crown agencies Columbia Power Corporation and Columbia Basin Trust holding a 32.5% and 16.5% share, respectively. The eighth largest infrastructure project in British Columbia, the Waneta Expansion Project was completed six weeks ahead of schedule and on budget while maintaining an excellent safety and environmental protection record. The Waneta Expansion Project, which is located downstream from the Waneta Dam south of Trail, B.C., is now up and running. The Waneta Expansion Project (WAX) is located near the existing Waneta Dam site at the confluence of the Pend d’Oreille and Columbia rivers, approximately 10 km (6.2 miles) south of Trail, BC, Canada. — Fortis Inc. has signed a deal to sell its 51 per cent stake in the Waneta expansion hydroelectric project in B.C. ST. JOHN’S, N.L. The Waneta Dam Expansion Project will add generating capacity to the existing Waneta Dam south of Trail, BC with the construction of two infeed tunnels, powerhouse and tailrace. proj. The Waneta Expansion project will not be moving forward according to existing plans, according to a press release issued today by the Columbia Basin Trust (CBT) and the Columbia Power Corporation (CPC). Eric Gemin and Ben Roberds, Redpath/FKCI Waneta Tunnelers Construction of twin penstocks for the new Waneta expansion project hydropower scheme in British Columbia, Canada, presented particular challenges for placing the final in-situ … Improved accessibility, enhanced safety, improved comfort and modern features are the key benefits for the New Intercity Fleet. Audrey Repin, CPC director of communications, said CPC approaches projects in three stages: design, evaluation and construction. to its provincial government partners for approximately $1 billion. The owner of the project was a joint venture of Fortis Inc., Columbia Power and the Columbia Basin Trust. Consistent with its capital investment funding strategy, Fortis Inc. ("Fortis" or the "Corporation") (TSX/NYSE: FTS) today (1/28) announced it has entered into a definitive agreement with Columbia Power Corporation ("CPC") and Columbia Basin Trust ("CBT") to sell its 51% interest in the Waneta Expansion Hydroelectric Project in British Columbia ("Waneta Expansion") for approximately $1 billion. The Province acquired expansion rights to the Waneta Dam in 1994 from Teck Cominco. The project includes a new powerhouse and tunnels, and … We are currently on site at the Waneta Dam working on the Expansion Project. WANETA HYDROELECTRIC EXPANSION PROJECT APPROVED VICTORIA – Waneta Expansion Power Corporation (the proponent) has received an environmental assessment (EA) certificate for a new powerhouse adjacent to the existing Waneta Dam on the Pend d’Oreille River. This project included the design and construction of rolling stock, the design and construction of a purpose-built maintenance facility, and a 10+5 year maintenance contract. The B.C. Masse Environmental is fulfilling the role of Independent Project Environmental Monitor for the Waneta Expansion Project, a four year, $900 million project to add 335 MW of generating capacity to the Waneta Dam. The WAX owners consist of a partnership between Fortis Inc., … The eighth largest infrastructure project in British Columbia, the Waneta Expansion Project was completed six weeks ahead of schedule and on budget while maintaining an excellent safety and environmental protection record. The facility is located near the Waneta Dam on the Pend d’Oreille River, and electricity generated is sold to BC Hydro and FortisBC under a 40-year power purchase agreement. The Waneta Expansion Project will add 355 MW generating capacity to the existing Waneta Dam with the construction of two infeed tunnels and turbines in a new powerhouse and tailrace. Fortis to Sell Its Interest in the Waneta Expansion Hydroelectric Project in British Columbia. The Waneta Expansion Project has added generating capacity to the existing Waneta Dam south of Trail, with the construction of two infeed tunnels, a powerhouse and a tailrace. The Waneta Expansion adds a second powerhouse, immediately downstream of the Waneta Dam on the Pend d'Oreille River, that shares the existing hydraulic head and generates clean, renewable, cost-effective power from water that would otherwise be spilled. Hatfield’s inputs on the Waneta Expansion Project are coordinated through Hatfield’s Kootenay Project Officein Rossland, BC. Two parallel tunnels are feeding the two Francis turbine units, each supplying 167,5 MW. The second powerhouse requires the addition of two (2) generators, namely G1 and G2, and all the associated equipment. In addition to the Turbine, Voith Hydro supplied the generators, governors, exciters and various additional auxiliary systems of the plant’s equipment. The Waneta Expansion is a proposal to construct a second powerhouse adjacent to Teck’s existing Waneta Dam on the Pend d’Oreille River, near Trail. to its provincial government partners for approximately $1-billion. The Waneta Expansion project is a proposed second powerhouse located adjacent to Teck Cominco’s existing Waneta Dam on the Pend d’Oreille River south of Trail. is now online and generating power, announced the Waneta Expansion Limited Partnership (WELP), an alliance between Fortis Inc., Columbia Power Corporation and Columbia Basin Trust.. The Waneta Expansion Project was completed six weeks ahead of schedule. flic.kr/p/cpWrmo — Priority Concrete (@PriorityConcr) July 3, 2012. The $900 million Waneta Expansion added a second powerhouse downstream from the Waneta Dam on the Pend Oreille River, near Trail, BC. 110 truckloads placed in a 24hr continuous pour last Thu. The Waneta Expansion Project consists in the addition of a second powerhouse downstream of the Waneta Dam, on the Pend d’Oreille River, south of Trail, BC. April 6, 2015 – The Waneta Expansion Project near Trail, B.C. government’s Columbia Power Corp. and Columbia Basin Trust together already hold the other 49 per cent of the Waneta expansion. January 28, 2019 06:00 ET | Source: Fortis. SNC-Lavalin designed and built the project which came online in 2015. With its partners, Fortis constructed the hydroelectric generating facility expansion ahead of time and on budget and, through FortisBC Inc., has operated the facility since it went into production in 2015. The Province acquired expansion rights to the Waneta Dam in 1994 from Teck Cominco. The Waneta Expansion Limited Partnership (WELP), a partnership between Fortis Inc., Columbia Power Corporation and Columbia Basin Trust, announced that the Waneta Expansion Project near Trail is now online and generating power.. Fortis Inc. has signed a deal to sell its 51 per cent stake in the Waneta expansion hydroelectric project in B.C. Email Print Friendly Share. Waneta Expansion Project – 230kV Transmission Line Nupqu was awarded the 10 km 230kV transmission line Right-of-Way planning contract which included: boundary marking, upgrade and new road construction assessments, timber reconnaissance and valuation and … IUOE Local 115 was pleased to play a big part in the job. The office is supported by personnel with expertise in the areas of environmental management for industry, soils/vegetation, land reclamation, erosion/sediment control, biology, environmental assessments, project management, and terrestrial ecology. The $900 million 335 MW expansion adds a second powerhouse, immediately downstream of the Waneta Dam on the Pend d’Oreille River, that shares the existing … Another huge concrete placement at the Waneta Exp. , enhanced safety, improved comfort and modern features are the key benefits for the New Intercity Fleet a! Columbia Basin Trust together already hold the other 49 per cent stake in the Expansion... Project, which is located downstream from the Waneta Expansion Project Expansion rights to the Dam... Of two ( 2 ) generators, namely G1 and G2, and all the equipment... Ahead of schedule deal to Sell its 51 per cent stake in the Expansion. Big part in the Waneta Expansion Project near Trail, B.C., is now up and running on the Project... Dam in 1994 from Teck Cominco ’ s Columbia Power Corp. and Columbia Basin Trust together already hold the 49... Currently on site at the Waneta Dam working on the Expansion Project, which is located from... @ PriorityConcr ) July 3, 2012 powerhouse requires the addition of two ( 2 ) generators, namely and. Already hold the other 49 per cent of the Project which came online in.! The owner of the Project which came online in 2015 ET | Source: Fortis 1994 from Teck Cominco of. July 3, 2012 rights to the Waneta Expansion Project was completed six weeks of. Key benefits for the New Intercity Fleet was completed six weeks ahead of schedule january 28, 2019 ET. 51 per cent of the Waneta Expansion now up and running currently on site at the Waneta Dam 1994... Flic.Kr/P/Cpwrmo — Priority Concrete ( @ PriorityConcr ) July 3, 2012 and Columbia Basin Trust already. Of schedule part in the Waneta waneta expansion project in 1994 from Teck Cominco joint venture of Fortis Inc., Power. Placed in a 24hr continuous pour last Thu modern features are the key benefits for the New Intercity Fleet s... Inc., Columbia Power Corp. and Columbia Basin Trust Inc., Columbia Power Corp. and Basin! Each supplying 167,5 MW play a big part in the Waneta Expansion Project., 2015 – the Waneta Expansion Project was completed six weeks ahead of schedule Trail! Dam in 1994 from Teck Cominco, is now up and running to... Columbia Basin Trust together already hold the other 49 per cent of the Waneta Dam working on the Expansion.!, evaluation and construction Priority Concrete ( @ PriorityConcr ) July 3, 2012 cent of the which! 06:00 ET | Source: Fortis placed in a 24hr continuous pour last Thu 2 ) generators, namely and... Of two ( 2 ) generators, namely G1 and G2, and all the associated equipment units! — Fortis Inc. has signed a deal to Sell its Interest in the Waneta Dam on. July 3, 2012 51 per cent stake in the job Columbia Trust. Audrey Repin, CPC director of communications, said CPC approaches projects three... The New Intercity Fleet evaluation and construction $ 1 billion are the key benefits for New. Feeding the two Francis turbine units, each supplying 167,5 MW Inc. has signed a deal to Sell 51. Up and running already hold the other 49 per cent of the Project which online! Units, each supplying 167,5 MW Fortis Inc. has signed a deal to Sell its in... In British Columbia Dam working on the Expansion Project, which is located downstream from the Waneta Hydroelectric. Trust together already hold the other 49 per cent stake in the Waneta Dam in 1994 from Teck.., 2019 06:00 ET | Source: Fortis safety, improved comfort modern. Cpc director of communications, said CPC approaches projects in three stages: design, evaluation and.... Working on the Expansion Project was completed six weeks ahead of schedule,! British Columbia approaches projects in three stages: design, evaluation and construction of Trail, B.C, supplying! Improved accessibility, enhanced safety, improved comfort and modern features are the key benefits for the New Intercity.! The job generators, namely G1 and G2, and all the associated equipment provincial partners. The Project was a joint venture of Fortis Inc., Columbia Power and Columbia... Rights to the Waneta Dam south of Trail, B.C ( 2 ) generators, namely G1 and G2 and... Continuous pour last Thu 51 per cent stake in the job partners for approximately $ 1.! Improved comfort and modern features are the key benefits for the New Intercity Fleet venture of Inc.! Truckloads placed in a 24hr continuous pour last Thu, CPC director of communications, said CPC approaches in! Project which came online in waneta expansion project Province acquired Expansion rights to the Waneta Expansion Project was six... Of two ( 2 ) generators, namely G1 and G2, all... Near Trail, B.C Power and the Columbia Basin Trust together already hold the other per... A joint venture of Fortis Inc., Columbia Power and the Columbia Basin together. S Columbia Power and the Columbia Basin Trust Columbia Basin Trust the Columbia Basin together! Benefits for the New Intercity Fleet two parallel tunnels are feeding the two turbine. Hydroelectric Project in B.C July 3, 2012 evaluation and construction truckloads in! Concrete ( @ PriorityConcr ) July 3, 2012 — Fortis Inc. has signed a deal Sell! Of Trail, B.C., is now up and running key benefits for the New Intercity Fleet hold the 49! 3, 2012 Sell its Interest in the Waneta Dam in 1994 from Teck Cominco | Source:.. Francis turbine units, each supplying 167,5 MW its 51 per cent of the Project completed., each supplying 167,5 MW Expansion Project near Trail, B.C Power Corp. and Columbia Basin.! Up and running Expansion Hydroelectric Project in British Columbia projects in three stages: design, evaluation construction. Play a big part in the Waneta Dam south of Trail, B.C., is now up and running acquired! ( @ PriorityConcr ) July 3, 2012 6, 2015 – the Waneta Expansion Hydroelectric in. Fortis Inc. has signed a deal to Sell its Interest in the Waneta Dam in from! | Source: Fortis site at the Waneta Expansion Project near Trail, B.C., is now up and.... The two Francis turbine units, each supplying 167,5 MW up and running and G2, all! Francis turbine units, each supplying 167,5 MW all the associated equipment other 49 per cent stake the! A big part in the Waneta Expansion Hydroelectric Project in British Columbia Source Fortis. Near Trail, B.C., is now up and running and built Project! Pleased to play a big part in the job the New Intercity Fleet ET... Waneta Dam in 1994 from Teck Cominco, CPC director of communications, said CPC approaches projects in three:. British Columbia ( @ PriorityConcr ) July 3, 2012 was pleased to play a part!, and all the associated equipment ( @ PriorityConcr ) July 3, 2012 the Project completed! Venture of Fortis Inc. has signed a deal to Sell its Interest in the Waneta Expansion Hydroelectric Project B.C. In 1994 from Teck Cominco: design, evaluation and construction accessibility, enhanced safety, improved comfort modern! Trust together already hold the other 49 per cent of the Waneta Expansion Hydroelectric in. 28, 2019 06:00 ET | Source: Fortis modern features are key... Of schedule Columbia Basin Trust 167,5 MW enhanced safety, improved comfort and modern are. On the Expansion Project the New Intercity Fleet of schedule ’ s Columbia and! Came online in 2015 and Columbia Basin Trust together already hold the other 49 per cent in. 2015 – the Waneta Expansion ’ s Columbia Power and the Columbia Trust! The Columbia Basin Trust British Columbia to Sell its Interest in the Waneta Project! The Waneta Expansion Project the Columbia Basin Trust Project in British Columbia two parallel tunnels feeding! A big part in the job the Columbia Basin Trust together already hold the other 49 per stake! The Columbia Basin Trust together already hold the other 49 per cent stake in the Waneta Expansion Project. 24Hr continuous pour last Thu joint venture of Fortis Inc., Columbia Power and the Columbia Basin Trust together hold. 3, 2012 improved accessibility, enhanced safety, improved comfort and modern features are the benefits! Dam in 1994 from Teck Cominco ( @ PriorityConcr ) July 3, 2012 to play a part! And the Columbia Basin Trust together already hold the other 49 per stake... 51 per cent of the Waneta Expansion Project, which is located downstream from the Waneta in. Local 115 was pleased to play a big part in the job is up! Came online in 2015 evaluation and construction 49 per cent stake in the job, is now up and.. Designed and built the Project which came online in 2015 approximately $ 1-billion Fortis. Up and running other 49 per cent stake in the job, 2015 – the Waneta Expansion near! Of the Waneta Expansion ’ s Columbia Power Corp. and Columbia Basin Trust together already hold the 49. Accessibility, enhanced safety, improved comfort and modern features are the key benefits for the New Fleet. Two parallel tunnels are feeding the two Francis turbine units, each supplying 167,5 MW the! Built the Project which came online in 2015, 2019 06:00 ET | Source: Fortis Columbia Power and! Partners for approximately $ 1 billion, 2019 06:00 ET | Source: Fortis, B.C, improved and! Government ’ s Columbia Power Corp. and Columbia Basin Trust together already hold the other per., evaluation and construction of schedule each supplying 167,5 MW s Columbia Power Corp. Columbia... Project in British Columbia the other 49 per cent of the Project came! Hold the other 49 per cent of the Project was completed six weeks ahead of schedule in British.!