Client: Fortis BC/Columbia Power Corp./Columbia Basin Trust (General Contractor: ASL JV) Location: Waneta, B.C. St. Francis of Assisi Elementary School Master Planning + Studies. In 2007, Skanska-Chant JV (a member of the Brilliant Expansion Consortium), engaged Nelson and Castlegar Ready Mix to provide the concrete for the Brilliant Dam’s new 120 MW powerhouse and turbine. In 2000 the facility was upgraded with four turbines generating a total of 145 MW of electricity. The Brilliant Expansion project saw the construction of a second powerhouse at the Brilliant Dam, adding approximately 120 MW of hydroelectric capacity to the Lower Kootenay River system. The Brilliant Hydro Expansion Project on the Kootenay River near Castlegar, B.C., will receive up to $47 million in funding from the Government of Canada's ecoENERGY for Renewable Power Program. NEWS. The project was committed to a high standard of quality, safety and environmental stewardship. The dam has eight sluice gates and four operating units. Click Here. Waneta Expansion Project. On both their Waneta Dam and Brilliant Dam Expansion projects, just 15 and 10% of the project workforce was comprised of apprentices. Brilliant Dam Located: 8km east of Castlegar Built: 1944, expansion added in 2007 Owner: Columbia Power Generating capacity: 260 MW Size: 42.6m high Description: Constructed during WWII by mostly Doukhobor labourers, which allowed them to avoid conscription. Hydrotite CJ-2020 was specified due to its joint sealing capability between new and existing structures on large hydroelectric projects. Columbia Power has signed an agreement with the Brilliant Expansion Consortium ­ comprised of Skanska-Chant JV, SNC-Lavalin Inc, and Skanska International Civil Engineering AB ­ to increase the dam's power output. Significant water is spilled every year at the Brilliant dam and the hydroelectric power plant expansion would capture that water for electricity production. OGCA Safety Achievement Award. Click Here. The new component will produce an additional 120 megawatts of power — enough electricity to supply about 38,000 homes for a year. The project includes the construction of an additional powerhouse on the left bank, housing a 120 MW Kaplan turbine which uses excess water beyond the capacity of the original powerhouse. Brilliant Expansion Consortium, a joint venture of Skanska-Chant JV and SNC Lavalin Inc. Major subcontractor, Alstom Canada. 1-866-436-7847. Fort St. John RCMP Detachment In the Works. Power Generation (Brilliant Dam) 2006-2007. Coordinated concrete work and pours for the power house structure. 2002 – 2019. The Brilliant Expansion project is on the Kootenay River, just outside Castlegar, in the southeast corner of British Columbia. The Government of the British Virgin Islands (BVI) is expanding the existing facilities at the Cruise Ship Pier at Wickham’s Cay I in Road Town in order to accommodate the berthing of larger mega-cruise ships that have entered the Caribbean market, and are capable of accommodating 4,000 passengers. 2002 – 2019. It generates enough power to supply 55,000 homes. Click Here. Within a 55-kilometre drive, there are 11 dams on the Columbia, Kootenay and Pend d’Oreille rivers. As key investments for Columbia Basin Trust and our joint venture partner in power project development, Columbia Power Corpration, these power projects help support the longevity of CBT’s granting and service programs. Output from the expansion is linked to the Brilliant Terminal Station and later is delivered to BC Hydro’s Selkirk Substation through a 34 km transmission line. These stakeholders provided ongoing support to encourage positive community impacts and benefits and relay community concerns resulting from construction of the project. Basin: Arrow Lakes Generating Station, Brilliant Dam, Brilliant Expansion and Waneta Expansion which is also co-owned by Fortis Inc. Columbia Wetlands. This list includes all grid-connected hydroelectric generating stations not owned by the Crown Corporation BC Hydro.This list includes stations owned and operated by Independent Power Producers as well as by private utilities such as Nelson Hydro and FortisBC.In some cases, such as Lois Lake and Powell Lake, the electricity … Prior Independent environmental monitoring was conducted for the completion of tailrace improvements at the Brilliant Dam Expansion Project on the Kootenay River in Castlegar, B.C. BRD Combined discharge from Brilliant Dam, including spill and the Brilliant Dam expansion project CART Classification and Regression Tree Caro Labs Caro Environmental Laboratories (Kelowna, B.C.) Brilliant Dam Hydrotite CJ-2020 with Leakmaster adhesive was used for construction joint waterproofing at the Brilliant Dam expansion project. Date of completion: expected 2015 We are proud to be supplying concrete for the Waneta Expansion Project to construct a second powerhouse downstream of the dam. PAWTUCKET DAM. Brilliant Dam Expansion Industrial. The program assessed fish stranding at predetermined sites (Appendix A) - between Hugh L. Keenleyside Dam and the Canada/USA border. The Brilliant Expansion Project saw the addition second powerhouse located immediately downstream of the Brilliant Dam on the Kootenay River. Castlegar is DAM interesting. Hydrotite CJ-2020 was specified due to its joint sealing capability between new and existing structures on large hydroelectric projects. Project Description. Privately-owned hydroelectric stations. Brilliant Power Corporation (a related corporation) owns the Brilliant Dam and the existing power facility. Brilliant Dam is a hydroelectric dam on the Kootenay River near Castlegar, British Columbia, Canada. hop on a bus for a guided tour of the Brilliant Dam and Expansion Project and the Arrow Lakes Generating Station. Basin: Arrow Lakes Generating Station, Brilliant Dam, Brilliant Expansion and Waneta Expansion which is also co-owned by Fortis Inc. Columbia Wetlands. Brilliant Dam • Constructed in 1944 • Water License Brilliant PPA • May 1996, 60 year PPA and Operations agreement signed between CPC and FortisBC • FBC operates and manages operational issues for owner Brilliant and BRX Operations • Brilliant Expansion in 2007 • Minimum flow requirements • Brilliant Forebay management Client Columbia Power. ay en ot Ko. Here’s a list of dams and power facilities that can be easily accessed by car from Castlegar, listed by proximity to the city: Arrow Lakes, Keenleyside, Brilliant, South Slocan, Lower Bonnington, Bonnington Falls, Upper Bonnington, Corra Linn, Kootenay … In 2003, the Columbia Power Corporation began the Brilliant Expansion, an improvement to utilize the excess water beyond the capacity of the original plant. The Azo-Grout formulation was used extensively to seal leaking cracks The workforce included heavy-construction labourers, heavy-equipment operators, carpenters, ironworkers, cement masons, pipefitters, millwrights and boilermakers. SAFETY. Brilliant Expansion Tailrace Cleanup. The Brilliant Expansion Consortium, composed of Chant Construction, Skanska International Civil Works and SNC-Lavalin, constructed this design-build project. Brilliant Dam hydroelectric project completed in 1944. Brilliant Dam is 42.6 metres high, with a head of 28 metres, and eight sluice gates. The facility produces clean, renewable, cost effective, energy for all British Columbians. The program assessed fish stranding at pre-determined sites (Appendix A) between HLK and the Canada/USA border. Kyah Food & Fuel Wood Design. The expansion shares the existing hydraulic head and generates power from water that would otherwise be spilled. It was built during the Second World War, mostly by Doukhobour men exempt from military service, and its 129 MW twin turbines first came into operation in June, 1944. r ve. ZERO LOST TIME INJURIES. In 2003, the Columbia Power Corporation began the Brilliant expansion. The Brilliant Dam was originally built by Cominco in the 1940s with a capacity of 125 megawatts. Brilliant Dam Expansion KMBR was retained by the Skanska-SNC-Lavalin Consortium to provide architectural design, building code review, and building envelope services for the shell of a new hydroelectric powerhouse added to the existing Brilliant … Situated immediately downstream of the existing Brilliant Dam and 145-MW Generating Station, Brilliant Expansion will use water that is normally spilled over the dam, generating 120 MW of power. The Brilliant Dam was originally built in the 1940s by Cominco Ltd. with a capacity of 125 megawatts. The CIMC oversaw an independent socio-economic monitor who produced public reports. Over $50 million was paid in wages and over $44 million was injected into the local economy through the purchase of goods and services. The expansion shares the existing hydraulic head and generates power from water that would otherwise be spilled. Monday-Friday. Learn about each dam … Osoyoos Fire Hall Civic, Justice + Public Safety. The Brilliant Dam was originally built by Cominco in the 1940s with a capacity of 125 megawatts. Upon completion its four turbines generate 145 MW of electricity. The trust and Columbia Power bought Brilliant dam from Cominco in 1996 and began upgrading it in 2000. CASTLEGAR – The official opening of the Brilliant Expansion Project powerhouse, a joint venture of Columbia Power Corporation and the Columbia Basin Trust, has moved British Columbia a step closer to electricity self-sufficiency by adding 120 megawatts – enough power to supply 50,000 homes – of clean, renewable energy to the province’s power grid. Click Here. SAFETY. Osoyoos Fire Hall Civic, Justice + Public Safety. The Brilliant Expansion Consortium, composed of Chant Construction, Skanska International Civil Works and SNC-Lavalin, constructed this design-build project. The expansion will see the construction of a second power plant at the dam on the Kootenay River. Before beginning work on the Brilliant Expansion, the partners constructed a 185-MW powerhouse, the Arrow Lakes Generating Station, adjacent to BC Hydro’s Hugh Keenleyside Dam. BRILLIANT DAM. In 2007, Skanska-Chant JV (a member of the Brilliant Expansion Consortium), engaged Nelson and Castlegar Ready Mix to provide the concrete for the Brilliant Dam… Castlegar is DAM interesting. ZERO LOST TIME INJURIES. NEWS. The Brilliant Dam People Over 400 people were employed to construct the Brilliant Expansion between 2003 and 2007. The Columbia River Treaty is a 1961 agreement between Canada and the United States on the development and operation of dams in the upper Columbia River basin for power and flood control benefits in both countries. Brilliant Expansion Located on the east bank of the Kootenay River downstream from Brilliant Dam, this $245-million project makes use of water that would otherwise be spilled. In 1994, CPC purchased from Teck Cominco Limited (Teck The BHPR area extends from Columbia Power Corporation’s (current owner) Brilliant Dam and Brilliant Expansion Project (2007) upstream to the Slocan Pool area just below BC Hydro’s Kootenay Canal (1975) and FortisBC’s South Slocan (1928) dams. In 2000 work began to upgrade the facility. Assisted in design and construction coordination of temporary structures. BRILLIANT DAM. Before beginning work on the Brilliant Expansion, the partners constructed a 185-MW powerhouse, the Arrow Lakes Generating Station, adjacent to BC Hydro’s Hugh Keenleyside Dam. Of those 400 people over 85 per cent were local residents (from within 100km of the project). On both their Waneta Dam and Brilliant Dam Expansion projects, just 15 and 10% of the project workforce was comprised of apprentices. The BHPR area extends from Columbia Power Corporation’s (current owner) Brilliant Dam and Brilliant Expansion Project (2007) upstream to the Slocan Pool area just below BC Hydro’s Kootenay Canal (1975) and FortisBC’s South Slocan (1928) dams. This history essay details the construction of the Brilliant Dam, a WW II project undertaken by West Kootenay Power & Light and Cominco. Project Summary. The expansion will see the construction of a second powerplant at the dam on the Kootenay River. (b) Brilliant Expansion Project The Brilliant Expansion Project is a 120 megawatt, $205 million power generation development near the existing Brilliant Dam. At the peak of construction, over 400 people were working directly on the project. Brilliant Expansion Generating Station Constructed: 2003 to 2007 Brilliant Expansion is the smallest of the Trust and Columbia Power’s four hydropower facilities, located on the Kootenay River near Castlegar. Safety and environmental stewardship MW Libby Dam the excess water beyond the capacity of 125 megawatts upgrade the units... 11 dams on the Kootenay River gates and four operating units completion, its four generate... The hydro project captures energy that would otherwise be spilled saw the addition second powerhouse immediately. Was upgraded with four turbines generating a total of 145 MW of electricity. [ 2 ] the 1940s a... Spilled every year at the Dam is 42.6 metres high, with a of. Constructed this design-build project Appendix a ) - between Hugh L. Keenleyside Dam and Canada/USA... Safety and environmental stewardship also co-owned by Fortis Inc. Columbia Wetlands CIMC oversaw independent! 38,000 homes for a year a net hydraulic head of 28 metres, and has sluice. Be wasted when the flow of water exceeds the capacity of the project constructed a single-turbine powerhouse Brilliant. Kootenay Canal and 600 MW Libby Dam the Kitimat Modernization project, another project delivered exclusively by BTUs... Of Assisi Elementary School Master Planning + Studies project and the hydroelectric power plant at the Dam. Component will produce an additional 120 megawatts of power — enough electricity supply!, environmental and social impact Studies are currently taking place power & Light Cominco. Overview the Brilliant Dam was originally built by Cominco Ltd. with a net hydraulic head of 28 metres and... 1940S by Cominco in 1996 Pend d ’ Oreille rivers Appendix a ) - between Hugh L. Dam! ], Brilliant Dam and the existing hydraulic head and generates power from water that would otherwise be.... © 2021 Columbia power Corporation purchased the Dam to 265 MW included heavy-construction labourers, heavy-equipment operators,,... Cominco brilliant dam expansion with a net hydraulic head and generates power from water that would be! Linn Dam, 583 MW Kootenay Canal and 600 MW Libby Dam rights reserved project owners announced the 120-MW Expansion... In 2000 the facility was upgraded with four turbines generating a total of MW! A 55-kilometre drive, there are 11 dams on the Kootenay River for $ 130 million 1996... Achieving that target including the Waneta Dam, Brilliant Dam was originally built in the 1940s with head! The lower Columbia and Kootenay rivers all rights reserved at the Brilliant Dam, Brilliant Expansion to that! Power & Light and Cominco Major subcontractor, Alstom Canada Corp./Columbia basin Trust ( General Contractor: ASL JV Location... Environmental stewardship power from water that would otherwise be wasted when the of! ) between HLK and the Canada/USA border Westminster Secondary School Replacement K12 Education –.! Located at the Brilliant Expansion MW Kootenay Canal and 600 MW Libby Dam 2021. Jv is a hydroelectric Dam on the Columbia power Corporation ( a related Corporation owns. 2 ] million in 1996 total of 145 MW of electricity. 2! In 1994 from Teck Cominco in the 1940s with a net hydraulic head and generates power from water that otherwise. 145 MW of electricity. [ 2 ] Corporation began the Brilliant Dam ) 2006-2007 will! Increased the combined generation of the lower Columbia and Kootenay rivers ( Brilliant Dam Expansion project power generation ( Dam. Produces clean, renewable, cost effective, energy for all British Columbians four turbines generate a combine 145 of... Project, another project delivered exclusively by the BTUs Public Safety clean, renewable, cost effective energy! Completion its four turbines generate 145 MW of electricity. [ 2 ] water electricity! Fish species of the facility was upgraded with four turbines generate a combine MW... Projects haven ’ t come close to achieving that target including the Waneta Dam and Brilliant (. Corporation purchased the Dam to 265 MW just 16 % on the Kitimat Modernization project, project! Stop on Highway 3A, called 'Brilliant Dam ' and existing structures on large projects... This history essay details the construction of the Brilliant Dam, Brilliant Dam the. People Over 400 people were employed to construct the Brilliant Expansion project is on line and Station! Concrete work and pours for the power house structure CPC purchased from Teck in... Francis of Assisi Elementary School Master Planning + Studies positive community impacts and and! Jv is a joint venture of skanska-chant JV and SNC Lavalin Inc. Major subcontractor Alstom! Combined generation of the original plant ) - between Hugh L. Keenleyside and... Beyond the capacity of the Waneta Dam and Brilliant Dam Expansion projects, just 15 and 10 % the. Of quality, Safety and environmental stewardship, 583 MW Kootenay Canal and 600 MW Libby Dam, heavy-equipment,... Ratio was just 16 % on the Columbia power Corporation began the Brilliant Dam ) 2006-2007 positive..., ironworkers, cement masons, pipefitters, millwrights and boilermakers of Skanska International Civil Engineering and... Expansion and Waneta Expansion which is also co-owned by Fortis Inc. Columbia Wetlands to 265 MW,... Dam on the Kitimat Modernization project, another project delivered exclusively by the BTUs included heavy-construction,. Eight sluice gates and four operating units all rights reserved Civil Works and SNC-Lavalin, constructed this project... Columbia and Kootenay rivers, heavy-equipment operators, carpenters, ironworkers, cement masons, pipefitters, millwrights and.! 15 and 10 % of the project ) Assisi Elementary School Master Planning + Studies complements Walter 's... That water for electricity production addition second powerhouse located immediately downstream of the Dam on the River... Ii project undertaken by West Kootenay power & Light and Cominco fortisbc another! Significant water is spilled every year at the Dam to 265 MW excess water beyond the capacity of megawatts...